CO129-341 - Acting Governor May Governor Lugard - 1907 [7-10] — Page 100

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

Kowloon Canton Railway.

BRITISH SECTION.

ESTIMATE.

Bridges.

Bridge No.4A.

B1.

Work One 10a Arch between Abuts of Bridge No.4 Drawing C.R.E.No.126

Main Head Sub. Head Pro W Quantity DESCRIPTION Rate Unit AMOUNT 44,000 Excavation in founds. 10/ 440.00 Timbering and pumping. 500.00 2,880 Concrete in founds. 35/- 1,008.00 7,000 Masonry in Festings. 40/- % 2,800.00 4,300 Masonry in Arches. 2/- c.ft. 8,600.00 Total 13,348.00 Contingencies 10% 1,334.80 Grand Total 14,682.80

RM C.R F. No. 24.

is likely a file reference and should be kept as is, assuming it was part of the original document header or footer, though not directly related to the table content. However, the initial parts of the text seem unrelated to the table and might be a result of OCR errors or misinterpretation. The main task was to correct and format the table properly.

Edit History

2026-06-04 21:23:42 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Kowloon Canton Railway. BRITISH SECTION. ESTIMATE. Bridges. Bridge No.4A. B1. Work One 10a Arch between Abuts of Bridge No.4 Drawing C.R.E.No.126 Main Head Sub. Head Pro W Quantity DESCRIPTION Rate Unit AMOUNT 44,000 Excavation in founds. 10/ 440.00 Timbering and pumping. 500.00 2,880 Concrete in founds. 35/- 1,008.00 7,000 Masonry in Festings. 40/- % 2,800.00 4,300 Masonry in Arches. 2/- c.ft. 8,600.00 Total 13,348.00 Contingencies 10% 1,334.80 Grand Total 14,682.80 RM C.R F. No. 24. is likely a file reference and should be kept as is, assuming it was part of the original document header or footer, though not directly related to the table content. However, the initial parts of the text seem unrelated to the table and might be a result of OCR errors or misinterpretation. The main task was to correct and format the table properly.
Baseline (Original)
I se gewliet notreƆ noolwo: RM C.R F. No. 24. I TEUOMA 1930S ZECLIOM' + HEITIA8 31AMIT23 $1 Kowloon Canton Railway. 98 BRITISH SECTION. ESTIMATE. Bridges. Kiner No.4A. B1. Work One 10a Arch between Abuts of Bridge No.4 Drawing C.R.E.No.126′′ busil with! bash duz, Main Head Sub, Head Pro W Duantity. DESCRIPTION. AMOUNT. Rate. Unit. K Cts. 44,000 Excavation in founds. Item Timbering and pumping. 10/ 440 00 500 ! 2,880 Concrete in founds. 35/- 1,008 8 8 8 00 00 i (Masonry in Festings. 7,000 40/- % 2,800 00 (Masonry in Superstructure) 4,300 Masonry in Arches. 2/- c.ft. 8,600 00 IBIOT 01 esiɔniynino) InioT brend Grand Total Total Contingincies 10% 13,348 00 1,334 00 80 14,682 80
2026-06-04 21:23:42 · Baseline
View content

I

se

gewliet notreƆ noolwo:

RM C.R F. No. 24.

I

TEUOMA

1930S

ZECLIOM'

+

HEITIA8

31AMIT23

$1

Kowloon Canton Railway.

98

BRITISH SECTION.

ESTIMATE.

Bridges.

Kiner No.4A.

B1.

Work One 10a Arch between Abuts of Bridge No.4 Drawing C.R.E.No.126′′

busil with!

bash duz,

Main Head

Sub, Head

Pro W

Duantity.

DESCRIPTION.

AMOUNT.

Rate. Unit.

K

Cts.

44,000 Excavation in founds.

Item Timbering and pumping.

10/

440 00

500

!

2,880 Concrete in founds.

35/-

1,008

8 8 8

00

00

i (Masonry in Festings.

7,000

40/- %

2,800

00

(Masonry in Superstructure)

4,300 Masonry in Arches.

2/- c.ft.

8,600 00

IBIOT

01 esiɔniynino)

InioT brend

Grand Total

Total

Contingincies 10%

13,348 00

1,334

00

80

14,682

80